Skip to content
Gal Majjistral
  • Home
  • About Us
  • Events in Our Territory
  • Media Gallery
  • Forms and Documents
  • Measures
    • CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
    • CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
    • CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
    • CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
  • Projects
  • News
  • Contact Us
  • Home
  • About Us
  • Events in Our Territory
  • Media Gallery
  • Forms and Documents
  • Measures
    •         - CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
    •         - CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
    •         - CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
    •         - CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
  • Projects
  • News
  • Contact Us

Measure 4 – Development of Green Infrastructure – Second Add. Budget – 1st Final List of Results

By GAL Majjistral Secretary14 Nov 2023Uncategorized
Measure 4 – Second Add. Budget – 1st Final List of ResultsDownload

Measure 2 – Strengthening a Healthy Cultural Identity – Second Add. Budget – 1st Final List of Results
Measure 1 – Restoration of Assets of Artistic and Cultural Value – Second Add. Budget – 2nd Preliminary List of Results

© 2019 GAL MAJJISTRAL Foundation
Theme by Think Up Themes Ltd. Powered by WordPress.