Skip to content
Gal Majjistral
  • Home
  • About Us
  • Events in Our Territory
  • Media Gallery
  • Forms and Documents
  • Measures
    • CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
    • CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
    • CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
    • CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
  • Projects
  • News
  • Contact Us
  • Home
  • About Us
  • Events in Our Territory
  • Media Gallery
  • Forms and Documents
  • Measures
    •         - CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
    •         - CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
    •         - CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
    •         - CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
  • Projects
  • News
  • Contact Us

Measure 4 – Development of Green Infrastructure – Add. Budget – 6th Final List of Results

By GAL Majjistral Secretary24 Mar 2023Uncategorized
Measure-4-6th-Final-List-of-Results-additional-BudgetDownload

Measure 4 – Development of Green Infrastructure – 6th Preliminary List of Results
Measure 4 – Development of Green Infrastructure – 6th Final List of Results

© 2019 GAL MAJJISTRAL Foundation
Theme by Think Up Themes Ltd. Powered by WordPress.