Skip to content
Gal Majjistral
  • Home
  • About Us
  • Events in Our Territory
  • Media Gallery
  • Forms and Documents
  • Measures
    • CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
    • CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
    • CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
    • CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
  • Projects
  • News
  • Contact Us
  • Home
  • About Us
  • Events in Our Territory
  • Media Gallery
  • Forms and Documents
  • Measures
    •         - CAP SP 1: Enriching Rural Heritage by Safeguarding Tangible and Intangible Elements (OPEN)
    •         - CAP SP 2: Strengthening Short Supply Chains for Local Gastronomy (OPEN)
    •         - CAP SP 3: Investing in Nature Connectedness, Protection and Enhancement of Biodiversity Resources (OPEN)
    •         - CAP SP 4: Knowledge Sharing and Capacity-building for Sustainable Development (OPEN)
  • Projects
  • News
  • Contact Us

Final Results – Measure 4: Development of Green Infrastructure (Batch 4)

By GAL Majjistral Secretary28 Dec 2019Events

Please use the link below to download the Final Results for Measure 4 – Batch 4

https://galmajjistral.com/wp-content/uploads/2019/12/Final-List-of-Results-M4-Batch-4.pdf.

Download PDF

Preliminary Results – Measure 4: Development of Green Infrastructure
Preliminary Results – Measure 4: Development of Green Infrastructure

© 2019 GAL MAJJISTRAL Foundation
Theme by Think Up Themes Ltd. Powered by WordPress.